The embroidery machine is a weapon produced by computer embroidery manufacturers. It is the mass production of embroidery. The computer embroidery machine is a machine that can work uninterrupted for 24 hours, but daily maintenance is also indispensable. Daily maintenance and maintenance are important factor to ensure the normal operation of the computer embroidery machine and extend the service life. So what are the maintenance of daily computer embroidery machines? EagleDigitizing summarizes the following tips:
Daily maintenance of computer embroidery machines, timely cleaning for machines is not only for the aesthetics of the machine, but also for the good working state of the machine to achieve exquisite embroidery effects.
1. Cleaning parts, parts, interval time, cleaning method
(1) Hooking mechanism, spin shuttle,
shuttle, shuttles, etc. are cleaned daily with brushes, except for debris and
wire heads, do not clean up with pointed tools;
(2) Threading mechanism, picking poles,
lines, felt places, etc. to clear the debris and line heads every day;
(3) The four pairs of guide rails before
and after the Y -axis delivery mechanism are cleaned up every day;
(4) The X -axis delivery mechanism and
guide rail are cleaned daily;
(5) Cleaning mechanism, clipline, rotating
wheels, picking lines, reeds, lines, etc. often clean up and clean;
(6) Power boxes, drivers, and places where this place is usually easy to ignore hygiene. The surface and ventilation must be remembered often.
2. Maintenance parts, lubrication sites, oil, interval time, maintenance methods
(1) The spindle gearbox chain chain will be
available every month, open the bearing in the cover to the butter every month;
(2) The hook -line mechanism spin shuttle,
shuttle, and shafts daily white oil, needle plate holes, cone -shaped step
gears open the town plate to make butter every month;
(3) The tuner -changing mechanism camcover
open the panel to make butter every month, and the meshing gear is opened to
open the panel once every half a year of butter;
(4) Passion -fabrally vertical axis, and
pick the needle to transfer the needle to 6 needles every day from the oil
tank. The connecting rod is covered with the oil hole every day.
(5) Picking the line axis, needle rods,
etc. with a needle in the vertical groove in the directional groove every day;
(6) The front and rear guide rails of the Y
-axis distribution mechanism once a month, and the X -axis delivery mechanism
guide rail once a month;
(7) The gear of the clamping mechanism opens
the cover and fight butter
(8) The embroidery frame is taken down the embroidery frame once a year of butter.
3. Precautions should be taken during maintenance
(1) The hook -line mechanism is cleaned
with a bristles of spin, shuttle, and shuttles, and removes the tip of the
lines, the line head, and do not use the tip tools to remove it.
(2) Picking the rods, tracts, and felt at
the sky to clear the mixed objects and line heads
(3) The Y -axis delivery mechanism before
and after the four pairs of guide rails (type 615) the same as the same
(4) X -axis delivery mechanism guide rail
two days the same
(5) The threading mechanism, rotating
wheels, picking lines, reeds, and wires often clean up debris and wipe
(6) Cleany debris on the surface of the
work table
(7) The surface and row fans on the
computer often wipe and open the back cover
(8) The surface of the power box, the driver box is often the same as the ventilation
4. Maintenance component lubrication site oil interval time method
(1) The spindle transmission chain chain
butter is opened on the cover, and the bearing butter monthly opens the cover
(2) Hooking mechanism spin shuttle,
shuttle, shaft white oil sky needle holes, cone -shaped gear butter monthly
open needle board
(3) The color -changing institution
camcover butter to open the panel, mesh gear butter opened the panel for half a
year
(4) Passion -fabrally vertical axis,
picking a pole white oil sky to move the needle to 6 needle position from the
oil slot, the white oil of the linked oil, the oil holes of the sky, the axis
bearing butter for half a year
(5) Picking the line axis, needle lever
white oil in the sky with needle in the vertical groove on the guide plate
(6) Ear-and-rear rails of the y-axis
clothing mechanism
(7) X-axis delivery mechanism guide rail butter
month-
(8) Gear butter of the cable mechanism-Open
the cover
(9) Remove the embroidered frame for the
sake of the butter of the embroidered frame